The tour will be led by the resident engineer, Nick Schiavone and the design engineer, Eric Seckinger, PE. This project replaces the existing terminal frontage roadways with a new 8-lane bridge over an 8-lane roadway, and relocates the new roadway to the north to make room for a future terminal expansion.
The tour will cost $25 for members and $35 for nonmembers. A box lunch will be provided. This tour will be on an active construction site, so you must bring your own personal protective equipment (PPE). Please RSVP by May 18th by contacting Eric Seckinger at eseckinger@hntb.com.